Setting up a project schedule
A project schedule enables you to visualize the timecodes of your project in a lightweight Gantt-chart, keeping you and your team aligned on the project timeline.

Contents:
- Before you begin
- Creating a project schedule
- Maintaining a project schedule
- Bulk editing of timecodes on the project schedule
- Creating a Finish-to-Start dependency
- FAQ/Troubleshooting
Before you begin:
-
In System Settings, “Enable the project schedule” must be set to TRUE. If you don’t have access to check or adjust this in System Settings, consult your System Administrator.
-
To create and maintain a project’s schedule, you will need the appropriate access.
Creating a project schedule:
-
Create a project that has at least 1 time-based budget with at least 1 timecode.
-
Configure the timecode settings
-
Toggle ON “Timecode is available on schedule”
-
Input Start Date and End Date
-
Select a Status (Defaults to “To Do”)
-
Input a Progress % (Optional)
-
Click Update Timecode
-
-
Click on the Schedule tab within your Project
-
Adjust the timeline view to Daily, Weekly, Monthly, Half-year or Yearly as needed.

Maintaining a project schedule
-
The Status of the Timecode is color-coded on the schedule.
Green = Done
Blue = In Progress
Grey = To-Do -
The % progress value is represented in a bolder-colored segment of timecode’s time bar.
-
The timecode dates can be adjusted by clicking and dragging the timecodes bar
Bulk editing dates of timecodes on the schedule
On the Schedule tab - click “Edit Dates” for a bulk interface to easily adjust the start and end dates of all the timecodes on the schedule.
You can also adjust the “Timecode is available on schedule” to bulk add other project timecodes to the schedule.

Creating a Finish-to-Start dependency:
Link two timecodes via a Finish-to-Start dependency to mandate that Timecode B cannot start until Timecode A has been completed.
-
Enable “Auto-Schedule” for the timecodes by clicking the Magic Wand icon next to the timecode.
-
Hover over a timecode’s progress bar until you see the white circles on each end.
-
Click on the white circle at the end of a timecode, and drag the dotted to the beginning of another timecode.
-
This will create an arrow that shows the dependency between the 2 timecodes.
-
Because you have the Auto-Schedule enabled, if you shift timecode A earlier or later, it will automatically adjust the start and end date of Timecode B accordingly.
-
To delete the dependency, click on the arrow and press the delete button on your keyboard

FAQ/Troubleshooting
Why can’t I see my timecodes on the schedule?
For a timecode to appear on the schedule, you must
-
Toggle ON “Timecode is available on schedule”
-
Input Start Date and End Date
-
Select a Status (defaults to “To Do”)
-
Input a Progress % (Optional)
Can I customize the Status drop-down options?
No. You can create custom fields against timecodes with your own drop-down options, but these will not pull through to the Schedule view.
Can I see the schedule for multiple projects at once?
No, the schedule is only available at a single project level.
Error Messages
You may open the project schedule tab and see the messages below prompting you to complete your schedule setup.
"No Budgets of time type yet
Time Budgets are required before scheduling.
Go to Project → Budgets"
- Your project doesn’t yet have any time-based budgets. You can read more about setting those up here Setting up Budgets.
"No timecodes yet
Timecodes are required before scheduling.
Go to Project → Timecodes"
- Your project doesn’t yet have any timecodes. You can read more about setting those up here Setting up Timecodes.
"No schedule yet
1 timecode needs scheduling info.
Edit Dates"
- The timecodes in your project have not been configured for the schedule. See Creating a Schedule.