Projects > Risk categories
Projectworks has a basic risk feature. Risks are able to be added to projects, with risks containing a number of attributes. Only the risk category field is able to have options customised.
Maintaining risk categories
Click the blue + button to add a new category. Categories can be edited by clicking the three dots to the right.
If a category is no longer needed it can be deactivated. A category can only be deleted if not linked to any risks.
